Přerov City Hall 2026: 1969 Modernist Renovation
Atelier gram renovates the 1969 Přerov City Hall in the Czech Republic, completed in 2026 with a glass staircase across 5,000 sqm.

Stock photo for illustration only, not from the actual event
- Atelier gram transformed the 1969 Přerov City Hall into a civic facility.
- A glazed southern staircase connects exhibition zones and meeting spaces.
- Internal layouts use open-plan floor plates retaining original structures.
- Construction took 2 years (2024-2026) across 5,000 square meters.
The reconstruction of Přerov City Hall by architecture practice atelier gram converts a closed administrative building completed in 1969 into an open, multifunctional civic facility in the Czech Republic. The project preserves the original steel structure and reinforced-concrete panels while introducing new spatial, material, and technological layers to fulfill contemporary standards for energy efficiency, fire safety, user comfort, and long-term utility. A transparent glazed staircase on the south facade serves as the primary architectural intervention, linking municipal administration areas with exhibition zones, informal meeting spaces, and publicly accessible destinations.
The existing structure represents a specific era of modernist public architecture defined by functional layouts and an inward-looking relationship with its surroundings. This overhaul tackles the evolving role of public administration by orienting the building toward T. G. M. square and incorporating functions that extend beyond standard municipal offices. The design establishes the town hall as civic infrastructure where circulation, meeting spots, exhibition areas, and administrative desks connect within a more accessible spatial network.

Stock photo for illustration only, not from the actual event
Attached to the south facade facing the urban square, the new glass-enclosed staircase acts as the central organizational spine of the renovation. It provides continuous vertical movement between levels while making pedestrian circulation visible from the public streetscape. Alongside its core transit function, the staircase accommodates exhibition zones and informal gathering spots, pulling activities traditionally confined to internal corridors closer to the building envelope.
Renovating mid-century modernist buildings while keeping their skeletal structure intact represents a vital sustainable approach in contemporary architecture, significantly cutting down embodied carbon compared to new builds. Adding transparent glazed extensions also subverts the intimidating nature of traditional bureaucratic institutions, transforming them into open spaces where the community feels a sense of ownership.
Czech practice atelier gram established a diagonal public pathway starting from the ground-floor reception and moving upward to the top-floor registry office and café. This sequence creates a fresh connection linking the square, municipal offices, and an accessible rooftop level. Non-load-bearing partitions were cleared away inside to create flexible open floor plates arranged around a stable central core, allowing office layouts to adapt over time without altering the primary frame.
The material strategy relies on preserving valuable elements from the late 1960s structure while layering new components to satisfy modern technical and environmental mandates. The original load-bearing steel frame and prefabricated reinforced-concrete PZD floor slabs remain intact following structural testing and cleaning. Consequently, the vintage framework stays visible throughout the renovated venue, paired with contemporary finishes and technical systems.
The steel column and beam skeleton continues as the main structural backbone. To meet current fire safety standards, structural steel components are encased in fire-protective plasterboard and trimmed with anodized aluminum sheeting, giving the exposed frame a uniform look while separating old from new materials. Prefabricated concrete floor panels received upgraded build-ups including thermal and acoustic insulation, a leveling anhydrite screed, and a durable polyurethane resin finish to maintain a clean aesthetic grid.
Source: designboom
Found something wrong in this article? Report an issue with this article
Comments
Leave a Comment