Skip to main content

Bangkok Governor Denies Canceling Monkey Cheek Projects

Bangkok Governor Chadchart Sittipunt clarified on Oct 1, 2026, that flood retention basin projects are not canceled, citing 11 billion baht land expropriation costs.

AI-written
Inewgen
01 Oct 2026Source: Khaosod Politics3 min read (0 views)
Share
Bangkok Governor Denies Canceling Monkey Cheek Projects

Stock photo for illustration only, not from the actual event

Font size
  • Bangkok Governor Chadchart Sittipunt denies canceling royal monkey cheek retention projects.
  • Targeted private lands require an estimated 11 billion baht for expropriation.
  • Emphasizes adherence to five royal flood prevention principles based on technical expertise.

Bangkok Governor Chadchart Sittipunt has firmly addressed public controversy surrounding the alleged cancellation of flood retention basin projects, confirming that the administration has no plans to scrap the royal initiative. He explained that technical constraints and private land ownership in designated areas require careful deliberation rather than outright abandonment.

The clarification was delivered on October 1, 2026, at the Department of Disaster Prevention and Mitigation (DDPM). The Bangkok Governor elaborated on the five flood management guidelines bestowed by the late King, which include constructing water barriers, building shortcut channels and drainage tunnels, improving canal networks, setting up dykes, and establishing water retention basins known as monkey cheeks.

Bangkok canal water management Thailand

Stock photo for illustration only, not from the actual event

Explaining the mechanics of monkey cheek basins, Chadchart noted that they require designated storage areas with efficient inlet and outlet systems to capture excess water during peak flows and release it safely afterward. Following comprehensive studies across various potential sites in Bangkok after the massive 2011 floods, officials discovered significant limitations regarding physical space and drainage infrastructure, with much of the land falling under private ownership.

11,000Million Baht Land Expropriation Cost

The Governor pointed out that proceeding with the project in its original format on those specific sites would require enormous financial resources for land expropriation and infrastructure development. Preliminary estimates indicate that expropriation costs alone would exceed 11 billion baht, necessitating alternative technical approaches tailored to the reality of the terrain.

Never miss the latest news?

Subscribe to get news summaries by email - not often enough to be annoying.

โฆษณา

“Then it is up to the Prime Minister.”

Chadchart Sittipunt

Contextual Analysis: Royal monkey cheek retention basins have served as a cornerstone of Bangkok's flood mitigation strategy, particularly following the severe floods of 2011. However, land acquisition in a densely populated metropolis like Bangkok consistently presents financial and legal hurdles. Direct clarification from city leadership helps maintain transparency and addresses public concerns regarding municipal flood control plans.

Addressing separate calls for his removal from office, the Bangkok Governor stated that the decision rests with the Prime Minister, while expressing full confidence in his ability to answer any questions regarding the administration's ongoing public service operations.

Source: Khaosod Politics

Comments

Leave a Comment
0/2000

Found something wrong in this article? Report an issue with this article