Skip to main content

Pipat monitors Hat Yai flood risks, pushes Khlong R.1 repair

Pipat Ratchakitprakarn admits he cannot guarantee if Hat Yai will avoid last year's floods, as officials rush Khlong R.1 drainage repairs before the rainy season.

AI-written
Inewgen
06 Oct 2026Source: Matichon Politics2 min read (0 views)
Share
Pipat monitors Hat Yai flood risks, pushes Khlong R.1 repair

Stock photo for illustration only, not from the actual event

Font size
  • Pipat Ratchakitprakarn chairs an urgent meeting to prepare for Hat Yai floods
  • He refrains from predicting if last year's disaster will recur due to nature
  • Authorities are fast-tracking the Khlong R.1 drainage canal repair project

Mr. Pipat Ratchakitprakarn is scheduled to chair a critical high-level meeting aimed at preparing emergency flood response measures for the Hat Yai district in Songkhla province. Following severe flooding in the past that caused widespread disruption and property damage, this proactive gathering focuses on evaluating current water management systems and establishing preventive protocols to safeguard local residents.

When questioned by reporters regarding whether the severe floods from the previous year are likely to repeat, Mr. Pipat candidly stated that he cannot firmly predict the outcome because weather patterns and heavy rainfall remain unpredictable natural disasters. Nevertheless, government agencies are taking every possible precaution to minimize potential risks and mitigate future impacts.

Thailand canal drainage water management infrastructure

Stock photo for illustration only, not from the actual event

The cornerstone of Hat Yai's flood prevention strategy relies heavily on the ongoing construction and repair works along the Khlong R.1 drainage canal, a vital infrastructure project designed to divert excess water away from the city center. Mr. Pipat has instructed the responsible engineering teams to accelerate their efforts and ensure full completion before the peak of the seasonal monsoon rains.

The Khlong R.1 drainage canal project serves as the backbone of Hat Yai's flood mitigation infrastructure in Songkhla province, engineered specifically to channel overflow away from the U Tapao canal and bypass the commercial downtown area. Expediting structural repairs and maximizing water flow capacity along this channel remain the single most critical factors in determining whether the city can successfully prevent recurring flood crises.

Today's agenda also encompasses inter-agency coordination between local administrative bodies and national departments to test early warning systems, position water pumps in high-risk zones, and rehearse rapid evacuation drills to guarantee prompt assistance for citizens in the event of an emergency.

Source: Matichon Politics

Comments

Leave a Comment
0/2000

Found something wrong in this article? Report an issue with this article